Hotel Spielmann
Our part
in this
project
The task
The requirements:
- Pellet boiler for a hotel
- Heating for the hotel & wellness area
Our solution
The ****Hotel Spielmann on the Zugspitze was equipped with a pellet boiler from Hargassner.
- 1 pellet storage container, 1 direct auger
- 2 x 4,000 l accumulator tanks
- 7 technical rooms, over 20 heat circuits, hot water preparation, ventilation & outdoor pool