Wiesinger Bau, Upper Austria
Our part
in this
project
The task
The requirements:
- Reliable, sustainable heating solution for heating all company buildings
- Utilisation of the company’s own waste wood as fuel
- High operational reliability despite varying fuel quality
Our solution
With the help of the new Magno-VR industrial heating system, Wiesinger Bau can now cover its heating requirements sustainably and cost-effectively. Waste wood from the company’s own carpentry workshop is utilised for energy and flexibly supplemented with regional wood chips
- 1 x Hargassner industrial heating Magno-VR 500 kW
- Industrial fuel extraction system with 9 m length, double
- 6600 litre accumulator tank










