Skip to content

Industrial heating

Industrial boiler in cascade for Welser Profile

Learn more
Industrial heating Magno-SR front without attachments

The internationally active metalworking company Welser Profile, based in Ybbsitz, has invested in modern biomass technology from Hargassner as part of a comprehensive heating technology changeover. The objective: to move away from fossil fuels and towards an economically and ecologically sustainable heat supply.

At the heart of the new plant are two Magno-SR 800 biomass boilers with a total output of 1.6 megawatts. The boilers were installed in cascade connection in a newly built boiler house – a solution that enables both reliability and demand-orientated operation. The 20 x 20 metre boiler house is a particular highlight: A spacious wood chip bunker is located directly underneath, which efficiently feeds the system via a moving floor system. Special screw conveyor technology transports the material directly to the boilers. A modern filter system and two accumulator tanks of 30 cubic metres each also ensure maximum efficiency.

Magno-SR 800

Ecological & economical

By switching to biomass, Welser has significantly reduced its CO₂ emissions and halved its running costs compared to the previous oil heating system. In addition to the ecological benefits, regional added value was also a key motivation: the wood chips are largely sourced locally, which provides local farmers with additional income. Discover more in the video.

In your region

Find a
contact person

nearby

Find a contact person